Our task is to design a system that checks for pressure loss within the
system. Since the breaks are automated at low pressure, any leaks can cause
train cart breaks to go off. Currently, the any leaks/obstructions have to
checked manually, one cart at a time. This project will ensure that the
leaks can be checked sooner, thus not wasting precious time.