Research Reports
- Hiller, J., Buch, N. and Van Dam, T., Material Related Distresses in Michigan PCC Pavements: Phase I, Final Report, Michigan Department of Transportation, Project No. 61-9471, October 1998.
- Buch, N., Monitoring Short Term Properties of Large Stone Concrete Mixtures, Final Report, Michigan Department of Transportation, Project No. 61-1465, October 1998.
- Frabbizio, M. A. and Buch, N., Factors Affecting Shear Capacity of Transverse Cracks in Jointed Concrete Pavements, Interim Report II, Michigan Department of Transportation, Project No. 61-9448, October 1998.
- Frabbizio, M. A. and Buch, N., Factors Affecting Shear Capacity of Transverse Cracks in Jointed Concrete Pavements, Interim Report I, Michigan Department of Transportation, Project No. 61-9448, October 1998.
- Soroushian, P., Buch, N., and Ravanbaksh, S., High Early Strength Concrete, Final Report, Michigan Dept. of Transportation, Project No. 61-9422, April, 1998.
- Zollinger, D., Buch, N., and Xin, D., Performance of CRC Pavements-CRC Pavement Design, Construction, and Performance, Volume 6, FHWA Report FHWA-RD-95., September, 1996.
- Buch, N. and Zollinger, D., Implication of Reliability in Mechanistic/Empirical Pavement Design Applications, Research Study No. 510437, National Coalition of Mechanistic Design, August, 1995.
- Moody, E, Buch, N. and Zollinger, D., Long Term Pavement Performance Data Analysis: Model Development of Distress and Roughness in Portland Cement Concrete Pavements, Interim Report, FHWA Report No. DTFH61-94-R-0028, August, 1995.
- Polma, F., Buch, N., Addison, M., Zollinger, D., Study of Life Extension and Rehabilitation of Residential Streets and Alleys, City of Garland, Texas, July, 1995.
- McCullough, B.F., Moody, E, Buch, N. and Zollinger, D., Fast Track Paving: Concrete Temperature Control and Traffic Opening Criteria for Bonded Concrete Overlays, Interim Report, FHWA Report No. DTFH61-93-R-00106, April 1994.