| |
industry Experience
Transportation Engineering
Coordinator, Champaign‑Urbana Urbanized Area Transportation Study (CUUATS).
Urbana, Illinois (February 1992 to October 1995 & June 1997- July 1999)
-
Directed the evaluation of multi-modal (roadway, auto, transit, and
pedestrian) improvements for the campus of the University of Illinois using
microscopic traffic simulation (CORSIM)
-
Directed
the transfer of existing traffic and roadway databases of the Champaign-Urbana
area to a Geographic Information-based System (GIS)
-
Conducted
traffic operations modeling, capacity and traffic signal operation analysis,
and developed signal design and timing plans using specialized software
-
Designed
traffic signal coordination plans for major corridors in Champaign‑Urbana area
-
Conducted
roadway corridor planning studies, scope of work development, and consultant
contract administration
-
Developed
access management guidelines for the Champaign-Urbana metro area
-
Directed
a comprehensive parking study for the downtown area of the City of Urbana
-
Directed
the development of a multi-modal long range transportation plan for the
Champaign-Urbana area
-
Directed
the development and implementation of a Geographic Information System (GIS) to
support transportation/traffic studies and information management
Transportation Planning Engineer, Central Massachusetts Regional Planning
Commission (CMRPC), Worcester, Massachusetts (August 1989 to February 1992)
-
Conducted
the long‑range modeling phase of a 300 sq mi corridor study identifying
specific problems and providing solutions relative to traffic operations and
safety
-
Conducted
traffic signal warrant, design, and evaluation studies
-
Performed
accident analysis and modeling studies
-
Conducted
traffic impact studies, traffic operations and accident analyses, and
statistical evaluation and forecasting of regional growth trends
-
Developed
and implemented a Pavement Management Technical Assistance program for the
CMRPC's member communities
Associate Transportation Planner, Central Massachusetts Regional Planning
Commission (CMRPC), Worcester, Massachusetts (February 1988 to July 1989)
-
Conducted
traffic impact studies for several major development projects
-
Performed
traffic operation analysis such as Capacity/LOS analysis, and signal
operation/optimization analysis
-
Analyzed
accident data to identify hazardous vehicle and pedestrian accident patterns
caused by geometric deficiencies, inclement weather conditions, and traffic
control deficiencies
-
Conducted
statistical evaluation and forecasting of regional growth trends
กก
|